Originally published by Milliken Infrastructure
Concrete Cloth Case Study
Customer: Noble County Highway Department
Issue: One 12’ diameter CMP culvert with deteriorating invert in need of invert protection to extend service life.
Installation dimensions: 100 feet long (CC8)
Aging 8′ CMP culvert was showing signs of deterioration in the bottom invert.
CC8 Concrete Cloth fabric was laid longitudinally to protect and extend the life of the invert.
Hydrating Installed CC8 Concrete Cloth fabric.
Installation of Concrete Cloth completed in four hours by Noble County maintenance crew.
If you’d like to learn more about Concrete Cloth, contact us today!